Newcastle upon Tyne

Freeman Hospital Day Treatment Centre

Project Details

Client

Robertsons Group

Location

Newcastle upon Tyne

Sector

Healthcare

Scope of Works

Client: The Newcastle upon Tyne Hospitals NHS Foundation Trust
Location: Freeman Hospital, Newcastle upon Tyne
Main contractor: Robertson Construction
Architect: P+HS Architects
Construction value: £15m
MEP value: £5m

Day Treatment Centre by day, the perforated tree-motif cladding set against the tree-lined Freeman site
Day Treatment Centre at dusk, its backlit perforated tree-motif facade glowing above the entrance
Operating theatre with its ultra-clean ventilation canopy, part of the building services CAD21 delivered.
A recovery bay with its blue feature wall, where day-case patients rest before heading home
Recovery and discharge bays with curtained spaces and daylight reaching the patient areas
Day Treatment Centre at dusk, its backlit perforated tree-motif facade glowing at the rear elevation
One of four operating theatres, fitted out for non-complex day-case surgery and procedures
Day Treatment Centre frontage at dusk, its backlit perforated tree-motif facade glowing above the entrance

Project Overview

During the pandemic, planned surgery across Newcastle kept losing out. Emergencies and winter pressures took priority on the main Freeman Hospital theatres, and waiting times for elective procedures had stretched towards four years.

The Day Treatment Centre was built to take that pressure off. It’s a stand-alone surgical facility on the Freeman site: four operating theatres, two with ultra-clean ventilation, alongside pre-op and two-stage recovery bays. It treats day-case patients only, with no overnight beds, so a surge in the main hospital doesn’t reach across and cancel someone’s planned operation.

The building still draws power, heat, water and medical gases from the wider hospital site, so keeping it running on its own meant giving each of those a backup. It has its own transformers, a standby generator, chillers, twelve hours of stored water and a reserve medical gas supply, so if a connection to the main hospital drops out, surgery carries on. Ventilation was designed the same way across all four theatres, which made them quicker to build and leaves room to add ultra-clean canopies to the other two later.

The hard part was time. The building went from staff car park to first operation in under twelve months, with our design running alongside construction rather than ahead of it. Standard room layouts, early work with the fit-out teams and a co-ordinated 3D model kept the installation moving at that pace.

The centre reached its 1,000th patient within three months, and the project was recognised at the Constructing Excellence North East Awards 2023, where the team won the Value and Integration & Collaboration categories.